Ebbsfleet Green Creative Identity

Final stages

13 March 2025

The two new trees went in without a hitch and their shiny red trunks are looking really stunning! Redrow had already improved the drainage in the area and so the last task was to back fill all the foundations and tree pits and cover over with a final blanket of turf.

The weather really came through for us! It was a glorious gift to work in the sunshine and experience and reflections sparkling on the steel threads.  The turf and trees just need to bed in for a few weeks.

Watch out for the blossom in April and the fencing coming down in May, when it will finally be open!